CASE STUDY
Eveline Lowe Primary School
Client: London Borough of Southwark
Architect: HKR
Main Contractor: Lengard
Products: SAPA EL 52 SX Curtain Wall
Value: £320,000
The photo gallery requires at least Flash version 9.0.28.
Please install the latest FlashPlayer.
The 378 pupil school was expanded to 420 places, with the junior school re-housed in a new building and the infant school modernised. HKR's competition winning scheme places new classrooms in glazed "pods" around the external boundary of the site, leaving the listed school buildings refurbished and intact.
Simon Innes lead architect on the project for HKR commented "The new design is an inspiring 21st century school that respects the design philosophy of the original listed buildings with their
pioneering open plan teaching arrangement."
Facade Engineering designed, manufactured and installed the glazed external "Pods" to the 3 blocks using SAPA Elegance 52 SX Curtain Wall with clear and coloured toughened laminated glazed
panels and integral SG Doors to give a completey flush, uninterupted facade.
Curtain Wall
Windows and Doors
Structural Glazing
